Home › Deliver
01 Deliver ——— 02 Deploy ——— 03 Refresh
Deliver: keep the site clear and move-in on schedule
Receiving, warehousing, outdoor laydown, crane and rigging, and final-mile delivery for IT and owner-furnished (OFCI) equipment, under one team and one custody record.
What the GC already worries about
- Safety on heavy lifts and constrained or live sites
- Equipment that arrives before the site is ready for it
- No room to stage, with every trade fighting for the same space
- Not knowing where millions of dollars of owner-furnished gear is right now
- No one owning the handoff between the GC, MEP trades, and the owner
Mission-critical construction support, start to set
New builds, expansions, and live-site upgrades run the same sequence: receive, stage, deliver, set. JKTS supports general contractors, electrical and mechanical subcontractors, and owner’s reps through every step, with sequencing built around construction milestones and ready-for-service dates.
Deliver Services
Warehousing & Staging
Indoor warehousing and outdoor laydown with custody-controlled intake and release. Equipment arrives when the site is ready, not before.
Crane & Rigging
Engineered lift planning, crane, rigging, and set in place by JKTS crews led by NCCCO-certified rigging leads.
Site Logistics & Final-Mile Delivery
Delivery to the exact point of use, in the order the install plan needs, without clogging the site.
How you'll measure us
Schedule adherence and dock-to-rack cycle time. If equipment is late to the set or the site is congested because of us, we missed.
FAQ
Receiving, warehousing and outdoor laydown, heavy haul, crane and rigging, set in place, and final-mile delivery, coordinated with the GC’s schedule and tracked under one custody record.
All three. The owner, GC, and tenant usually decide together. JKTS works directly for whoever holds the scope and coordinates with everyone else on site.
Yes. We receive OFCI equipment such as generators, chillers, and switchgear, store it indoors or in outdoor laydown, and release it on the install schedule.
After delivery comes deployment.
See how JKTS takes a hall from dark to live.